Once
there, we started the day with removing a large stump from the ground!
As you can see from the picture, it took all of us to get it out. Some
were pushing the stump from behind, while others pulled with rope! It
was a great accomplishment for the team to be able work together and
create a plan to remove the stump.
Once
the stump was removed, we were able to dig a trench so we can start
building the wall on the opposite side of the driveway. The trench took
all day to dig, but by the end of the day, we were ready to pour the
footings. Attached is a picture of the team working hard on the trench.